Concept · Set of pages
The seven phases an application moves through
Incubate, Build, Register, Deploy, Run, Evolve, Retire.
Page 1 of 6
By Ines Bekkar · Principal solutions architect · 1 July 2026 · 9 min read
An application moves through seven named phases: Incubate, Build, Register, Deploy, Run, Evolve, Retire. They are a lifecycle rather than a project plan — an application does not finish them and graduate; it lives in them.
Only Build is mandatory. Everything else is skippable or conditional, and an application that has been built, passes its conformance checks and has a green test run is a perfectly valid terminal state. Plenty of useful things never leave it.
Incubate — the four documents
Optional, and the phase most people should not skip.
Four documents are authored in order, each derived from the one before it: the description of the analysis in prose, the requirement it is read into, the manifest that names the operations the application will answer to and what each one takes, and the system design. The third of those is the one to read if you only read one — it is the contract, and everything downstream is checked against it.